DID Sri Aman Schemes [3]
|
DID SRI AMAN DIVISION |
|||
| HYDROLOGY | QUOTATION NOTICES | ||
|
SCHEMES |
ADMINISTRATION AND FINANCE | MECHANICAL | |
|
BASI IJOK CONTROLLED DRAINAGE SCHEME |
||
|
District |
Engkili |
|
|
Division |
Sri Aman |
|
|
Project Life |
30 years |
|
|
Scheme Location |
Basi Ijok |
|
|
Scheme Area |
209 Ha. |
|
|
Objective of Scheme |
1. To overcome salt water intrusion during high tide, perimeter bund and tidal gates were constructed. |
|
|
Scheme Components/ Infrastructures |
a). 17,832m length of Bund |
|
|
SG. KEREPOK CONTROLLED DRAINAGE SCHEME |
|
|
District |
Lingga |
|
Division |
Sri Aman |
|
Project Life |
30 years |
|
Scheme Location |
Sg. Kerepok |
|
Scheme Area |
196 HA |
|
Objective of Scheme |
1. To implement the basic drainage infrstructures so as to alleviate serious flooding and to control water level in the scheme. This is will improve the paddy field hence the standard of living among the farmers. |
|
Scheme Components/ |
a). 4,800m length of Bund |
|
|
|
