SEBUBOK ENGKALA CONTROLLED DRAINAGE SCHEME
District
Sri Aman
Division Sri Aman
Construction Period 1979 up to the present date.
Date of Completion 1979
Project Life 30 years
Scheme Location Part of the area is the land formed from the cut-off of Btg. Lupar ( Tanah baru ).
Scheme Area 168 ha. ( 142 ha. nett )
Cost of Construction RM 1.335 million., Annual O & M cost is RM 70,000.00 ( 1996 )
Objective of Scheme 1. To overcome salt water intrusion during high tide, perimeter bund and tidal gates were constructed.
2. To protect the area from the flash flooding from the interior, cut-off bund and drain were constructed.
3. To have a proper drainage so as to create a better condition for cultivation and increase land utilisation. Off season cropping introduced can increase the income of the farmers
Scheme Components/ Infrastructures a). 5.8 km of perimeter bund.
b). 4.1 km of perimeter drain.
c). 0.8 km of cut-off drain.
d). 2.2 km of internal drain.
e). 2 nos. of tidal control gates.
f). 4 nos. of R.C. check gates.
g). 33 nos. of timber bridges.
h). 1 no. of O.I.C. Quarters.
 
SEBRANG DRAINAGE SCHEME
District
Sri Aman
Division Sri Aman
Construction Period Block I completed in 1990, Block II completed on 21.8.1998
Date of Completion -
Project Life 30 years
Scheme Location The scheme is situated on the right bank of Btg. Lupar directly opposite Sri Aman Town.
Scheme Area Block I ( 200 Ha. ), Block II ( 400 Ha. )
Cost of Construction RM 800,000.00 ( Block I ) RM 960,000.00 ( Block II )
Objective of Scheme 1. To overcome salt water intrusion high tide, perimeter bund and tidal gates were constructed.
2. To protect the area from the flash flooding from the interior, cut-off bund and drain were constructed.
3. To have proper drainage so as to create a better condition for cultivation.
Block I was designed for Cocoa and tree crop planting by FELCRA, but FELCRA has abandoned the area in 1994 due to low price of cocoa. Block II is designed for the planting of oil palm.
Scheme Components/ Infrastructures BLOCK I
a ) 6.122 km of Perimeter Bund
b ) 6.122 km of Perimeter Drain
c ) 4.874 km of Cut-Off Drain
d ) 3.721 km of Internal Bund
e ) 6.607 km of Internal Drain
f ) 1 no. of 4' x 4' Tidal Control Gate
g ) 4 nos. of Belian Bridges.
BLOCK II
a ) 2 nos. 5' x 5' Tidal Control Gate
b ) 10.235 km of Perimeter Bund
c ) 10.235 km of Perimeter Drain/
Cut-Off Bund
d ) 6.451 km of Internal Bund
e ) 7.341 km of Internal Drain
f ) 8 nos. Belian Bridges
 
SKRANG DRAINAGE SCHEME
District
Sri Aman
Division Sri Aman
Construction Period Since 1970 after the scheme was completed.
Date of Completion 1970
Project Life 30 years
Scheme Location It comprises of two districtly separate low lying areas, the Paya Senama and Paya Tanjung. The Paya Senama begins at the junction of Sg. Senama at 142 milestone Kuching/Sibu Road. Paya Tanjung is located at the Tanjung of Batang Skrang.
Scheme Area 90 hectares.
Cost of Construction RM 125,000.00 to complete the scheme ( 1970 ). Annual O & M cost - RM 30,000.00 ( 1996 ).
Objective of Scheme To improve the area for better paddy planting. This is to additional income for the rubber farmers in the area.
Scheme Components/ Infrastructures a). 1 no. of Twin Culvert.
b). 1 no. of Drainage Control Gate at Tanjung.
c). 2 streches of Main Drains of 4.1 km at Paya Senama.
d). 1 streches of Main Drain of 0.7 km of Paya Tanjung.
e). 1 no. R. C. Check gate.
f). 2 nos. of 6' x 33' belian bridge.
 
TANJUNG SADURU DRAINAGE SCHEME
District
Lubok Antu
Division Sri Aman
Construction Period 1975 up to present date.
Date of Completion 1975
Project Life 30 years
Scheme Location The scheme is located in Lubok Antu District and is situated on the Batang Lupar about 16 km upstream from Sri Aman town.
Scheme Area 202 hectares.
Cost of Construction RM 160,000.00. Annual O & M cost is RM 80,000.00.
Objective of Scheme 1. To implement the basic drainage infrstructures so as to alleviate serious flooding and to control water level in the scheme. This is will improve the paddy field hence the standard of living among the farmers.
2. To improve the water managment within the scheme and also the field lots.
Scheme Components/ Infrastructures a). 6.7 km of perimeter bund and drain.
b). 1.2 km of cut-off drain.
c). 3.5 km of internal bund and drain.
d). 1 no. of tidal control gate.
e). 2 nos. of R.C. check gate.
f). 1 unit of site depot.
g). 5 nos. of timber crossing.
 
ENSURAI CONTROLLED DRAINAGE SCHEME
District                         
Engkilili
Division                            Sri Aman
Construction Period Since 2005
Date of Completion  21 September 2010
Project Life 30 years
Scheme Location  Engkilili
Scheme Area  425 Ha.
Cost of Construction  RM 5,110,951.75 (2009)
Objective of Scheme  1. To implement the basic drainage infrstructures so as to alleviate serious flooding and to control water level in the scheme. This is will improve the paddy field hence the standard of living among the farmers.
2. To improve the water managment within the scheme and also the field lots.
Scheme Components/ Infrastructures a). 25,700m length of farm road
b). Approximately 22,020m length of perimeter drain
c). Approximately 9,670m length of cut-off drain
d). 7 nos. Tidal Control gate (single-1200mm Dia.)
e). 5 nos. of 4250mm x 3500mm x 3 spans belian bridge.
f). 12 nos. of 1200mm x 3350mm x 4 spans belian bridge
 

Copyright © Department Of Irrigation & Drainage Sarawak


Last Updated On 21 Nov 2024

Operating Hours

Monday - Thursday
8:00am to 1:00pm & 2:00pm to 5:00pm
Friday
8:00am to 11:45pm & 2:15pm to 5:00pm
Saturday, Sunday & Public Holiday
Counter closed

image Polls
image Announcement