SEBUBOK ENGKALA CONTROLLED DRAINAGE SCHEME |
||
|
District |
Sri Aman |
|
|
Division |
Sri Aman |
|
|
Construction Period |
1979 up to the present date. |
|
|
Date of Completion |
1979 |
|
|
Project Life |
30 years |
|
|
Scheme Location |
Part of the area is the land formed from the cut-off of Btg. Lupar ( Tanah baru ). |
|
|
Scheme Area |
168 ha. ( 142 ha. nett ) |
|
|
Cost of Construction |
RM 1.335 million., Annual O & M cost is RM 70,000.00 ( 1996 ) |
|
|
Objective of Scheme |
1. To overcome salt water intrusion during high tide, perimeter bund and tidal gates were constructed. |
|
|
Scheme Components/ Infrastructures |
a). 5.8 km of perimeter bund. |
|
|
|
||
|
SEBRANG DRAINAGE SCHEME |
||
|
District |
Sri Aman |
|
|
Division |
Sri Aman |
|
|
Construction Period |
Block I completed in 1990, Block II completed on 21.8.1998 |
|
|
Date of Completion |
- |
|
|
Project Life |
30 years |
|
|
Scheme Location |
The scheme is situated on the right bank of Btg. Lupar directly opposite Sri Aman Town. |
|
|
Scheme Area |
Block I ( 200 Ha. ), Block II ( 400 Ha. ) |
|
|
Cost of Construction |
RM 800,000.00 ( Block I ) RM 960,000.00 ( Block II ) |
|
|
Objective of Scheme |
1. To overcome salt water intrusion high tide, perimeter bund and tidal gates were constructed. |
|
|
Block I was designed for Cocoa and tree crop planting by FELCRA, but FELCRA has abandoned the area in 1994 due to low price of cocoa. Block II is designed for the planting of oil palm. |
||
|
Scheme Components/ Infrastructures |
BLOCK I |
BLOCK II |
|
|
||
|
SKRANG DRAINAGE SCHEME |
||
|
District |
Sri Aman |
|
|
Division |
Sri Aman |
|
|
Construction Period |
Since 1970 after the scheme was completed. |
|
|
Date of Completion |
1970 |
|
|
Project Life |
30 years |
|
|
Scheme Location |
It comprises of two districtly separate low lying areas, the Paya Senama and Paya Tanjung. The Paya Senama begins at the junction of Sg. Senama at 142 milestone Kuching/Sibu Road. Paya Tanjung is located at the Tanjung of Batang Skrang. |
|
|
Scheme Area |
90 hectares. |
|
|
Cost of Construction |
RM 125,000.00 to complete the scheme ( 1970 ). Annual O & M cost - RM 30,000.00 ( 1996 ). |
|
|
Objective of Scheme |
To improve the area for better paddy planting. This is to additional income for the rubber farmers in the area. |
|
|
Scheme Components/ Infrastructures |
a). 1 no. of Twin Culvert. |
|
|
|
||
|
TANJUNG SADURU DRAINAGE SCHEME |
||
|
District |
Lubok Antu |
|
|
Division |
Sri Aman |
|
|
Construction Period |
1975 up to present date. |
|
|
Date of Completion |
1975 |
|
|
Project Life |
30 years |
|
|
Scheme Location |
The scheme is located in Lubok Antu District and is situated on the Batang Lupar about 16 km upstream from Sri Aman town. |
|
|
Scheme Area |
202 hectares. |
|
|
Cost of Construction |
RM 160,000.00. Annual O & M cost is RM 80,000.00. |
|
|
Objective of Scheme |
1. To implement the basic drainage infrstructures so as to alleviate serious flooding and to control water level in the scheme. This is will improve the paddy field hence the standard of living among the farmers. |
|
|
Scheme Components/ Infrastructures |
a). 6.7 km of perimeter bund and drain. |
|
|
|
||
|
ENSURAI CONTROLLED DRAINAGE SCHEME |
||
|
District |
Engkilili |
|
|
Division |
Sri Aman |
|
|
Construction Period |
Since 2005 |
|
|
Date of Completion |
21 September 2010 |
|
|
Project Life |
30 years |
|
|
Scheme Location |
Engkilili |
|
|
Scheme Area |
425 Ha. |
|
|
Cost of Construction |
RM 5,110,951.75 (2009) |
|
|
Objective of Scheme |
1. To implement the basic drainage infrstructures so as to alleviate serious flooding and to control water level in the scheme. This is will improve the paddy field hence the standard of living among the farmers. |
|
|
Scheme Components/ Infrastructures |
a). 25,700m length of farm road |
|
|
|
||