SUSTOM

 

SUSTOM


STORMWATER MANAGEMENT DIVISION
 ABOUT US ORGANISATION CHART SUSTOM CONTACT PERSON
 

 

 Sarawak Urban Stormwater Management (SUStoM)

This guideline has been prepared by DID Sarawak for the Drainage Plan Approval based on Sarawak Urban Stormwater Management (SUStoM). SUStoM was approved by the State Cabinet on 28th January 2016 as a planning standard for development control to incorporate stormwater management into the design to minimize environmental degradation and improve aesthetic as well as recreational appeal of areas in Sarawak.

It is a guideline to establish a uniform technical standards for the developers, engineers, consultants, planners, architects, Local Authorities and Government Agencies in submitting the SUStoM Planning Submission, Earthwork Plan and Erosion and Sediment Control Plan (ESCP) and Stormwater Management Plan.

Its objective is to assist the applicants or project proponent to submit a complete and comprehensive SUStoM Planning Submission, Earthwork Plan and Erosion and Sediment Control Plan (ESCP) and Stormwater Management Plan that is in accordance with SUStoM requirements.

This publication emphasizes on 3 main development processes whereby DID is involved as follows:-
i) SUStoM Planning Submission,
ii) Earthwork Plan & Erosion Sediment Control Plan, and
iii) Stormwater Management Plan Submission (Engineering Plan).

This guideline is read in conjunction with Manual Saliran Mesra Alam (MSMA) 2nd Edition, 2012 & Guideline for Erosion and Sediment Control Plan (ESCP) in Malaysia 2010.

 

Download Sarawak Urban Stormwater Management (SUStoM) Guideline)
 
 

Copyright © Department Of Irrigation & Drainage Sarawak


Last Updated On 21 Nov 2024

Operating Hours

Monday - Thursday
8:00am to 1:00pm & 2:00pm to 5:00pm
Friday
8:00am to 11:45pm & 2:15pm to 5:00pm
Saturday, Sunday & Public Holiday
Counter closed

image Polls
image Announcement