KERJA-KERJA KAWALAN HAKISAN PANTAI DI NEG
ERI SARAWAK

COASTAL EROSION CONTROL PROTECTION WORKS
NO. PROJECT LOCATION
YEAR OF
COMPLETION
LENGTH/TYPE OF PROTECTION WORKS
MALAYSIAN
PLAN
FUND
1 Sg. Serpan, Asajaya, Samarahan
1994
300m - Rock Revetment 6 MP Federal
2 Pantai Bintulu Phase I, Bintulu
1994
300m & 60m   - Groyne 6 MP Federal
3 Sg. Bilis, Asajaya, Samarahan 1995 350m - Rock Revetment 6 MP Federal
4 Km 2 Miri-Kuala Baram Road, Miri 1997 650m - Rock Revetment 7 MP Federal
5 Damai Golf Course, Kuching 1997 500m-Rock Revetment
State
6 Pantai Bintulu Phase II, Bintulu
1998
Two 60m - Rock Revetment
150m - Rock Revetment
7 MP Federal
7 Marine Dept. Lighthouse, Kuala baram, Miri
1998 200m - Rock revetment
State
8 Kpg. Teluk Nipah, Buntal, Kuching
1999 1.8km - Rock Revetment 7 MP Federal
9 Km 9, Jln. Miri-Kuala Baram, Miri
1999 374m - Rock Revetment
State
10 Pantai Lutong, Jln. Miri-Kuala Baram, Miri
2000 470m Rock Revetment 7 MP Federal
11 Holiday Inn Damai Lagoon Resort, Kuching
2001 380m Rock Revetment
90m - Stepped revetment

State
12 Taman Seaview, Bintulu
2001
178m - Rock Revetment
8 MP
Federal
13 Km20 Jln. Miri-Kuala baram, Miri
2001 1.5km - Rock revetment
8 MP
Federal
14 Marine Dept. Lighthouse, Kuala Baram, Miri
2002 Rock revetment
State
15 Pantai Kpg. Punang, Lawas, Limbang
2004 500m - Rock Revetment
8 MP
Federal
16 Pantai Kpg. Pasir Pandak, Kuching
2005
400m - Rock Revetment
8 MP
Federal
17 Pantai Taman Good Park, Bintulu
2005
100m - Rock Revetment
8 MP
Federal
18 Kampung Tanah Hitam, Sematan, Kuching
2005 180m - Rock Dumping
8 MP
Federal
19 Kampung Batu Satu, Lutong, Miri
2005 180m - Rock Dumping
8 MP
Federal
20 Kpg. Rejang, Mukah 2006 580m - Rock Revetment
9 MP
Federal
21 Sg. Serpan, Asajaya, Samarahan
2006 400m - Rock revetment
9 MP
Federal
22 Jln. Miri-Kuala Baram (Pan Borneo Highway), Miri
2006 1.9km - Rock Revetment
9 MP
Federal
23 Kpg. Santubong, Kuching
2007 390m - Rock Revetment 9 MP Federal
24 Pantai Kpg. Punang (Phase II), Lawas, Limbang
2007 200m - Rock Revetment 9 MP Federal
25 Marriot Resort & SPA, Miri
2007 550m - Rock Revetment
170m - Rock Revetment
9 MP Federal
26 Pantai Ria, Bintulu 2008 - 9 MP Federal
27 Kampung Buntal Lama
2008 168m - Rock Revetment
9 MP
Federal
28 Menaiktaraf Struktur Kawalan Hakisan Pantai di Kpg. Santubong, Kuching 2008 JPS Concrete Block
9 MP
Federal
29 Lot 854, Jln. Dk Tem. Oyong Lawai, Miri 2008 -
9 MP
Federal
30 Jabatan Kesihatan, Miri 2008 -
9 MP
Federal
31 Mariott Resort & SPA, Miri 2008 -
9 MP
Federal
32 Kpg. Batu Satu, Jln Kuala Baram, Miri 2008 -
9 MP
Federal
33 Kampung Bejaya, Miri 2008 -
9 MP
Federal
34 Beach Park, Bintulu 2008 -
9 MP
Federal
35 Tg. Bungai, Miri 2008 -
9 MP
Federal
36 Km 22 Jln. Lutong-Kuala Baram, Miri 2008 -
9 MP
Federal
37 Jln. Miri-Kuala Baram (Pan Borneo Highway) Phase II, Miri
2009 800m - Rock Revetment
9 MP
Federal
38 Kpg. Tanah Hitam, Sematan (Phase II), Kuching 2009 Rock Revetment
9 MP
Federal
39 Kampung Litong, Mukah
2009 425m - JPS Concrete Block
9 MP
Federal
40 Kampung Pasir Pandak Phase II, Kuching 2010 Rock Revetment
9 MP
Federal
41 Jln Lutong-Kuala Baram (Phase III), Miri 2010 -
9 MP
Federal
42 Pejabat Kastam Sematan, Kuching 2010 -
9 MP
Federal
43 Kampung Buntal Lama (Phase II), Kuching 2010 Rock Revetment
9 MP
Federal
44 Kampung Pasir Panjang, Kuching 2010 500m -'Terrafix or Interlocking Concrete Block
9 MP
Federal
45 Jln. Lutong-Kuala Baram (Phase IV), Miri 2010 Rock revetment
9 MP
State
46 Water Front Santubong, Kuching 2012 150m - Rock Revetment with 350m pedestian walkway, 3 nos. staircase & 5 nos. concrete bench
9 MP
Federal
47 Sg. Bangat, Lawas 2012 Rock Revetment 10 MP State
48 Muara Sg. Tekuyung, Kuching 2012

-construction of 76m earth bund

-construction of 146mx0.9m concrete drain

- construction of 1 nos. of 0.9m box culvert c/w HDPE flag gate.

10 MP State
49 Rehabilitation Sg. Tekuyung River Mouth Erosion Protection Structures 2013 - 10 MP State

Ke atas

 

JALAN LUAR
BANDAR DI NEGERI SARAWAK

RURAL ROAD PROJECTS UNDER RMKe-7
NO.
PROJECT NAME
LENGTH (KM)
YEAR OF COMPLETION
JKR ROAD STANDARD
1
M&M Jln. Mukah-Balingian, Mukah
11.2
2000
R3 Premix
2
M&M Jln. Gedong-Gumpey, Samarahan
6.85
2001
R3 Premix & 1 Bridge
3
M&M Jln. Gedong-Tg. Paoh, Samarahan
2.025
2001
R1 Premix
4
M&M Jln. Matop/Beduru/Teberu/Pelawa, Sri Aman
5.0
2002
R1 Premix
5
M&M Jln. Kuala Lawas-Merapok, Lawas, Limbang
8.5
2002
R3 Premix & 1 Bridge
RURAL ROAD PROJECTS UNDER RMKe-8
NO.
PROJECT NAME
LENGTH (KM)
YEAR OF COMPLETION
JKR ROAD STANDARD
1
M&M Jln. Kpg. Tallian Ulu/Kpg. Penakub Ulu, Mukah
6.4
2005
R3 Premix
2
Naik Taraf Jalan Medait, Limbang
2.2
2005
R3 Premix
3
Naik Taraf Jalan Medait, Limbang
3.3
2005
R3 Premix
4
M&M Jln. Tongkah Melayu/Tongkah Dayak/Arus Melayu/Sebangan
5.0
2005
R3 Premix
RURAL ROAD PROJECTS UNDER NKRA 2010-2013
NO.
PROJECT NAME
LENGTH (KM)
YEAR OF COMPLETION
JKR ROAD STANDARD
1
M&M Jln. Kpg. Kuala Lawas, Lawas
6.5
2008
R3 Premix
2
M&M Jln. Simpang Kg. Gumpey/Lubok Tranggas, Gedong
2.4
2007
R3 Premix
3
M&M Jln. Trombol/Loba Rambungan/Telaga Air, Kuching
11.49
2009
R3 Premix & 6 Bridges
4
NT Jln. Panchor/Kg. Bintawa/Kg. Soh, Serian, Samarahan
15.3
2009
R3 Premix & 2 Bridges
5
M&M Jln. Tebakang Melayu/Kg. Krusin, Samarahan
5.57
2009
R3 Premix
6
NT Jln Kg. Sisok/Kg. Sau, Mukah
9.18
2012
R3 Premix & 6 Bridges
7
M&M Jln. Gedong/Simunjan (Fasa I), Samarahan
4.0
On going
R3 Premix & 2 Bridges
8
M&M Jln. Gedong/Simunjan (Fasa II), Samarahan
14.0
On going
"
9
M&M Jalan Tuie/Supa/Manggut, Pusa (Fasa I), Betong
5.0
On going
R3 Premix
10
M&M Jalan Tuie/Supa/Manggut, Pusa (Fasa II), Betong
11.2
On going
"
11
M&M Jln. Skim Penempatan Semula Kuala Lawas/Kg Datu, Lawas
5.61
2011
R3 Premix & Ferry Ramps
12
M&M Jln. SK Ulu Pedanum, Pakan
3.43
2011
R3 Premix & 2 Bridges
13
M&M Jln. Ng. Melipis/SK Ulu Melipis/Rumah Mulai, Kapit
6.65
2012
R1 Premix & 1 Bridge
14
M&M Jln. Kg. Patrikan/SMK Merapok, Lawas, Limbang
3.49
2011
R3 Premix & 1 Bridge
15
M&M Jln. Kg. Stakan Melayu, Kota Samarahan
1.5
2011
R3 Premix & 1 Bridge
16
M&M Jln Mengkalap/Senampuan (Fasa I), Lawas, Limbang
9.0
2013
R3 Premix
17
M&M Jln Mengkalap/Senampuan (Fasa II), Lawas, Limbang
7.0
2013
R3 Premix
18
M&M Jln. Sungai Poyan/Kpg. Sembling, Limbang
3.5

Project terminated to Design Stage 1 by KKLW M'sia
19
M&M Jln. Menalun, Sg. Poi, Kanowit
10.0
On going
R1 Premix & 3 Bridges
20
M&M Jln. Kg. Debak/Kg. Babu/Kg. Bungai/Kg. Lallang, Betong
1.5
2012
R3 Premix
21
M&M Jln. Labang/Rh. Bebuling Baroh/Skim Tg. Sebekut, Spaoh
3.5
2013
R1 Gravel & 1 Bridge
22
M&M Jln. Rh. Lanting Ak Utek Ke Rh.Budong, Sg. Dijil, Tamin
8.0
2013
R1 Gravel
23
M&M Jalan Dari Simpang Jln. Sibu/Bintulu ke SK. Sg. Anak, Selangau, Sibu
10.0
2012
R1 Premix
24
M&M Jalan Dari Simpang Jln. Sibu/Bintulu ke SK. Iban Union, Selangau, Sibu
8.0
Retender
R1 Premix
25
M&M Jalan Dari Simpang Jln. Tatau/Sangan ke Rumah Pemanca Segaya, Tekalit
10.0
On going
R1 Premix
26
M&M Jalan Ke Rh. Rantai, Sg. Tepus, Selangau
1.5
Retender
R2 Gravel
27
M&M Jalan Ke Rh. Malang, Ulu Kemena, Selangau
1.5
2011
R1 Premix
28
M&M Jln. Kg. Paloh/Kg. Beting Maro, Kabong
6.0
2012
R1 Premix
29
M&M Jln. Mengkalap/Long Suang, Lawas
8.0
2013
R1 Premix & 1 Bridge
30
M&M Jln. Sundar/Kg. Senampuan Baru, Lawas
0.5
2012
R1 Premix


 

 

 

Copyright © Department Of Irrigation & Drainage Sarawak


Last Updated On 29 Apr 2026

Operating Hours

Monday - Thursday
8:00am to 1:00pm & 2:00pm to 5:00pm
Friday
8:00am to 11:45pm & 2:15pm to 5:00pm
Saturday, Sunday & Public Holiday
Counter closed

image Polls
image Announcement