KERJA-KERJA KAWALAN HAKISAN PANTAI DI NEGERI SARAWAK
| COASTAL EROSION CONTROL PROTECTION WORKS |
|||||
| NO. | PROJECT LOCATION |
YEAR OF COMPLETION |
LENGTH/TYPE OF PROTECTION WORKS |
MALAYSIAN PLAN |
FUND |
| 1 | Sg. Serpan, Asajaya, Samarahan |
1994
|
300m - Rock Revetment | 6 MP | Federal |
| 2 | Pantai Bintulu Phase I, Bintulu |
1994
|
300m & 60m - Groyne | 6 MP | Federal |
| 3 | Sg. Bilis, Asajaya, Samarahan | 1995 | 350m - Rock Revetment | 6 MP | Federal |
| 4 | Km 2 Miri-Kuala Baram Road, Miri | 1997 | 650m - Rock Revetment | 7 MP | Federal |
| 5 | Damai Golf Course, Kuching | 1997 | 500m-Rock Revetment | State | |
| 6 | Pantai Bintulu Phase II, Bintulu |
1998
|
Two 60m - Rock Revetment 150m - Rock Revetment |
7 MP | Federal |
| 7 | Marine Dept. Lighthouse, Kuala baram, Miri |
1998 | 200m - Rock revetment | State | |
| 8 | Kpg. Teluk Nipah, Buntal, Kuching |
1999 | 1.8km - Rock Revetment | 7 MP | Federal |
| 9 | Km 9, Jln. Miri-Kuala Baram, Miri |
1999 | 374m - Rock Revetment | State | |
| 10 | Pantai Lutong, Jln. Miri-Kuala Baram, Miri |
2000 | 470m Rock Revetment | 7 MP | Federal |
| 11 | Holiday Inn Damai Lagoon Resort, Kuching |
2001 | 380m Rock Revetment 90m - Stepped revetment |
State | |
| 12 | Taman Seaview, Bintulu |
2001
|
178m - Rock Revetment |
8 MP
|
Federal |
| 13 | Km20 Jln. Miri-Kuala baram, Miri |
2001 | 1.5km - Rock revetment |
8 MP
|
Federal |
| 14 | Marine Dept. Lighthouse, Kuala Baram, Miri |
2002 | Rock revetment | State | |
| 15 | Pantai Kpg. Punang, Lawas, Limbang |
2004 | 500m - Rock Revetment |
8 MP
|
Federal |
| 16 | Pantai Kpg. Pasir Pandak, Kuching |
2005
|
400m - Rock Revetment |
8 MP
|
Federal |
| 17 | Pantai Taman Good Park, Bintulu |
2005
|
100m - Rock Revetment |
8 MP
|
Federal |
| 18 | Kampung Tanah Hitam, Sematan, Kuching |
2005 | 180m - Rock Dumping |
8 MP
|
Federal |
| 19 | Kampung Batu Satu, Lutong, Miri |
2005 | 180m - Rock Dumping |
8 MP
|
Federal |
| 20 | Kpg. Rejang, Mukah | 2006 | 580m - Rock Revetment |
9 MP
|
Federal |
| 21 | Sg. Serpan, Asajaya, Samarahan |
2006 | 400m - Rock revetment |
9 MP
|
Federal |
| 22 | Jln. Miri-Kuala Baram (Pan Borneo Highway), Miri |
2006 | 1.9km - Rock Revetment |
9 MP
|
Federal |
| 23 | Kpg. Santubong, Kuching |
2007 | 390m - Rock Revetment | 9 MP | Federal |
| 24 | Pantai Kpg. Punang (Phase II), Lawas, Limbang |
2007 | 200m - Rock Revetment | 9 MP | Federal |
| 25 | Marriot Resort & SPA, Miri |
2007 | 550m - Rock Revetment 170m - Rock Revetment |
9 MP | Federal |
| 26 | Pantai Ria, Bintulu | 2008 | - | 9 MP | Federal |
| 27 | Kampung Buntal Lama |
2008 | 168m - Rock Revetment |
9 MP
|
Federal |
| 28 | Menaiktaraf Struktur Kawalan Hakisan Pantai di Kpg. Santubong, Kuching | 2008 | JPS Concrete Block |
9 MP
|
Federal |
| 29 | Lot 854, Jln. Dk Tem. Oyong Lawai, Miri | 2008 | - |
9 MP
|
Federal |
| 30 | Jabatan Kesihatan, Miri | 2008 | - |
9 MP
|
Federal |
| 31 | Mariott Resort & SPA, Miri | 2008 | - |
9 MP
|
Federal |
| 32 | Kpg. Batu Satu, Jln Kuala Baram, Miri | 2008 | - |
9 MP
|
Federal |
| 33 | Kampung Bejaya, Miri | 2008 | - |
9 MP
|
Federal |
| 34 | Beach Park, Bintulu | 2008 | - |
9 MP
|
Federal |
| 35 | Tg. Bungai, Miri | 2008 | - |
9 MP
|
Federal |
| 36 | Km 22 Jln. Lutong-Kuala Baram, Miri | 2008 | - |
9 MP
|
Federal |
| 37 | Jln. Miri-Kuala Baram (Pan Borneo Highway) Phase II, Miri |
2009 | 800m - Rock Revetment |
9 MP
|
Federal |
| 38 | Kpg. Tanah Hitam, Sematan (Phase II), Kuching | 2009 | Rock Revetment |
9 MP
|
Federal |
| 39 | Kampung Litong, Mukah |
2009 | 425m - JPS Concrete Block |
9 MP
|
Federal |
| 40 | Kampung Pasir Pandak Phase II, Kuching | 2010 | Rock Revetment |
9 MP
|
Federal |
| 41 | Jln Lutong-Kuala Baram (Phase III), Miri | 2010 | - |
9 MP
|
Federal |
| 42 | Pejabat Kastam Sematan, Kuching | 2010 | - |
9 MP
|
Federal |
| 43 | Kampung Buntal Lama (Phase II), Kuching | 2010 | Rock Revetment |
9 MP
|
Federal |
| 44 | Kampung Pasir Panjang, Kuching | 2010 | 500m -'Terrafix or Interlocking Concrete Block |
9 MP
|
Federal |
| 45 | Jln. Lutong-Kuala Baram (Phase IV), Miri | 2010 | Rock revetment |
9 MP
|
State |
| 46 | Water Front Santubong, Kuching | 2012 | 150m - Rock Revetment with 350m pedestian walkway, 3 nos. staircase & 5 nos. concrete bench |
9 MP
|
Federal |
| 47 | Sg. Bangat, Lawas | 2012 | Rock Revetment | 10 MP | State |
| 48 | Muara Sg. Tekuyung, Kuching | 2012 |
-construction of 76m earth bund -construction of 146mx0.9m concrete drain - construction of 1 nos. of 0.9m box culvert c/w HDPE flag gate. |
10 MP | State |
| 49 | Rehabilitation Sg. Tekuyung River Mouth Erosion Protection Structures | 2013 | - | 10 MP | State |
JALAN LUAR BANDAR DI NEGERI SARAWAK
| RURAL ROAD PROJECTS UNDER RMKe-7 | ||||
|
NO.
|
PROJECT NAME
|
LENGTH (KM)
|
YEAR OF COMPLETION
|
JKR ROAD STANDARD
|
|
1
|
M&M Jln. Mukah-Balingian, Mukah |
11.2
|
2000
|
R3 Premix |
|
2
|
M&M Jln. Gedong-Gumpey, Samarahan |
6.85
|
2001
|
R3 Premix & 1 Bridge |
|
3
|
M&M Jln. Gedong-Tg. Paoh, Samarahan |
2.025
|
2001
|
R1 Premix |
|
4
|
M&M Jln. Matop/Beduru/Teberu/Pelawa, Sri Aman |
5.0
|
2002
|
R1 Premix |
|
5
|
M&M Jln. Kuala Lawas-Merapok, Lawas, Limbang |
8.5
|
2002
|
R3 Premix & 1 Bridge |
| RURAL ROAD PROJECTS UNDER RMKe-8 | ||||
|
NO.
|
PROJECT NAME
|
LENGTH (KM)
|
YEAR OF COMPLETION
|
JKR ROAD STANDARD
|
|
1
|
M&M Jln. Kpg. Tallian Ulu/Kpg. Penakub Ulu, Mukah |
6.4
|
2005
|
R3 Premix |
|
2
|
Naik Taraf Jalan Medait, Limbang |
2.2
|
2005
|
R3 Premix |
|
3
|
Naik Taraf Jalan Medait, Limbang |
3.3
|
2005
|
R3 Premix |
|
4
|
M&M Jln. Tongkah Melayu/Tongkah Dayak/Arus Melayu/Sebangan |
5.0
|
2005
|
R3 Premix |
| RURAL ROAD PROJECTS UNDER NKRA 2010-2013 | ||||
| NO. |
PROJECT NAME
|
LENGTH (KM)
|
YEAR OF COMPLETION
|
JKR ROAD STANDARD
|
|
1
|
M&M Jln. Kpg. Kuala Lawas, Lawas |
6.5
|
2008
|
R3 Premix |
|
2
|
M&M Jln. Simpang Kg. Gumpey/Lubok Tranggas, Gedong |
2.4
|
2007
|
R3 Premix |
|
3
|
M&M Jln. Trombol/Loba Rambungan/Telaga Air, Kuching |
11.49
|
2009
|
R3 Premix & 6 Bridges |
|
4
|
NT Jln. Panchor/Kg. Bintawa/Kg. Soh, Serian, Samarahan |
15.3
|
2009
|
R3 Premix & 2 Bridges |
|
5
|
M&M Jln. Tebakang Melayu/Kg. Krusin, Samarahan |
5.57
|
2009
|
R3 Premix |
|
6
|
NT Jln Kg. Sisok/Kg. Sau, Mukah |
9.18
|
2012
|
R3 Premix & 6 Bridges |
|
7
|
M&M Jln. Gedong/Simunjan (Fasa I), Samarahan |
4.0
|
On going
|
R3 Premix & 2 Bridges |
|
8
|
M&M Jln. Gedong/Simunjan (Fasa II), Samarahan |
14.0
|
On going
|
" |
|
9
|
M&M Jalan Tuie/Supa/Manggut, Pusa (Fasa I), Betong |
5.0
|
On going
|
R3 Premix |
|
10
|
M&M Jalan Tuie/Supa/Manggut, Pusa (Fasa II), Betong |
11.2
|
On going
|
" |
|
11
|
M&M Jln. Skim Penempatan Semula Kuala Lawas/Kg Datu, Lawas |
5.61
|
2011
|
R3 Premix & Ferry Ramps |
|
12
|
M&M Jln. SK Ulu Pedanum, Pakan |
3.43
|
2011
|
R3 Premix & 2 Bridges |
|
13
|
M&M Jln. Ng. Melipis/SK Ulu Melipis/Rumah Mulai, Kapit |
6.65
|
2012
|
R1 Premix & 1 Bridge |
|
14
|
M&M Jln. Kg. Patrikan/SMK Merapok, Lawas, Limbang |
3.49
|
2011
|
R3 Premix & 1 Bridge |
|
15
|
M&M Jln. Kg. Stakan Melayu, Kota Samarahan |
1.5
|
2011
|
R3 Premix & 1 Bridge |
|
16
|
M&M Jln Mengkalap/Senampuan (Fasa I), Lawas, Limbang |
9.0
|
2013
|
R3 Premix |
|
17
|
M&M Jln Mengkalap/Senampuan (Fasa II), Lawas, Limbang |
7.0
|
2013
|
R3 Premix |
|
18
|
M&M Jln. Sungai Poyan/Kpg. Sembling, Limbang |
3.5
|
Project terminated to Design Stage 1 by KKLW M'sia | |
|
19
|
M&M Jln. Menalun, Sg. Poi, Kanowit |
10.0
|
On going
|
R1 Premix & 3 Bridges |
|
20
|
M&M Jln. Kg. Debak/Kg. Babu/Kg. Bungai/Kg. Lallang, Betong |
1.5
|
2012
|
R3 Premix |
|
21
|
M&M Jln. Labang/Rh. Bebuling Baroh/Skim Tg. Sebekut, Spaoh |
3.5
|
2013
|
R1 Gravel & 1 Bridge |
|
22
|
M&M Jln. Rh. Lanting Ak Utek Ke Rh.Budong, Sg. Dijil, Tamin |
8.0
|
2013
|
R1 Gravel |
|
23
|
M&M Jalan Dari Simpang Jln. Sibu/Bintulu ke SK. Sg. Anak, Selangau, Sibu |
10.0
|
2012
|
R1 Premix |
|
24
|
M&M Jalan Dari Simpang Jln. Sibu/Bintulu ke SK. Iban Union, Selangau, Sibu |
8.0
|
Retender
|
R1 Premix |
|
25
|
M&M Jalan Dari Simpang Jln. Tatau/Sangan ke Rumah Pemanca Segaya, Tekalit |
10.0
|
On going
|
R1 Premix |
|
26
|
M&M Jalan Ke Rh. Rantai, Sg. Tepus, Selangau |
1.5
|
Retender
|
R2 Gravel |
|
27
|
M&M Jalan Ke Rh. Malang, Ulu Kemena, Selangau |
1.5
|
2011
|
R1 Premix |
|
28
|
M&M Jln. Kg. Paloh/Kg. Beting Maro, Kabong |
6.0
|
2012
|
R1 Premix |
|
29
|
M&M Jln. Mengkalap/Long Suang, Lawas |
8.0
|
2013
|
R1 Premix & 1 Bridge |
|
30
|
M&M Jln. Sundar/Kg. Senampuan Baru, Lawas |
0.5
|
2012
|
R1 Premix |